India  

Delhi-Meerut RRTS: NCRTC begins Namo Bharat train trial runs between key stations; check details

DNA Monday, 14 April 2025
The stretch between the two stations spans about 4.5 kilometres. Once operational, this link will allow smooth, air-conditioned train services to Meerut.
0
shares
ShareTweetSavePostSend
 

You Might Like


💡 newsR Knowledge: Other News Mentions

Delhi–Meerut Regional Rapid Transit System Delhi–Meerut Regional Rapid Transit System Under-construction and partially operational regional transit system in India

Delhi-Meerut RRTS: Namo Bharat train timings changed for July 27 due to...; to start at...

The service will be available continuously till 10 pm on the day of the examination. Check the starting time below:
DNA

Namo Bharat Namo Bharat Indian electric multiple unit train used for RapidX

Big Boost for Ghaziabad: DMRC plans 4 metro corridors, Gokulpuri-Hindon Airport link proposed

The metro corridor, which would also act as an extension of the Namo Bharat corridor that runs through Sahibabad, is expected to assist more than 5 lakh people,..
DNA

Meerut Meerut Metropolis in Uttar Pradesh, India

Doctor asleep, man 'bleeds to death' in Meerut hospital

A junior resident doctor at Lala Lajpat Rai Memorial Medical College in Meerut has been suspended following allegations of negligence. The doctor allegedly..
IndiaTimes